Geocell engineering application
Treatment of half-filled and half-filled roadbed
On the ground on the slopes of the natural slope ACTS in 1:5, build up the embankment, the embankment base should dig the steps, steps shall not be less than 1 m width, the installment construction or reconstructing highway roads widened, the linkage between the new and old roadbed fill slope, should excavation steps, the general steps of high grade highway width is 2 m, in each of the steps horizontally laid large room, using the large room of their own facade confining reinforcement effect, better solve the problem of uneven settlement.